INSIGHTS | October 23, 2026

Below the Threshold: Why Britain’s Smallest Power Generators Face a Four-Year Cyber Security Gap

Key Takeaways

  • A small-scale gas generator was taken offline for four days in July 2026. The UK Government confirmed the incident but has not formally attributed it. [1]
  • Under the Network and Information Systems Regulations 2018, electricity generation is captured only at 2GW cumulative capacity, and the threshold expressly excludes generators that are not connected to a transmission system. [2]
  • On 5 August 2026 the Department for Energy Security and Net Zero and Ofgem confirmed that baseline cyber resilience requirements for all Ofgem licensees will be built on Cyber Essentials Plus, consulted on during 2027 and in place across the sector by the end of 2030. [3]
  • The same government response acknowledges that Cyber Essentials Plus excludes operational technology and lacks controls covering governance, incident response, risk management and supply chain. Its Plus tier applies the same five technical controls as Cyber Essentials with independent testing, rather than extending them. [3] [9]
  • IT and OT segregation was the single most requested additional control among consultation respondents, raised by 18 of the 49 organisations and individuals who replied. [3]

Why This Matters Now

In July 2026 a small-scale British generating asset stopped producing power for four days following a cyber incident. Michael Shanks, Minister of State at the Department for Energy Security and Net Zero, confirmed that the incident had affected a small-scale energy generator, and the Department stated that at no point was the wider energy system at risk. [1] Press reporting linked the intrusion to Iranian-aligned actors, though the UK Government has made no formal attribution.

The detail that matters for security leaders is not the attribution. It is the position of the asset. A four-day outage at a small distribution-connected generator is an outage at something well below the regulatory perimeter drawn in 2018, which means the operator was almost certainly under no statutory cyber resilience obligation at all.

That perimeter is not a historical accident. The Government’s own Energy Sector Cyber Security Strategy states that the NIS Regulations were only ever intended to apply to the most critical operators and therefore do not provide holistic coverage of the energy system. [4] The strategy also commits Government to encourage more reporting of cyber incidents that fall below NIS thresholds, which is a plain acknowledgement that the sub-threshold estate is a blind spot.

The threat is not theoretical. In December 2025 a threat actor targeted around 30 distributed renewable assets in Poland, including wind and solar farms and a combined heat and power plant. Generation and heat supply held, and the plant involved served nearly 500,000 heat customers. What matters is how the attacker got in: internet-exposed firewall appliances without multi-factor authentication, unpatched devices and reused credentials. Most of those routes could have been closed by basic cyber hygiene. A parallel attack the same day on a smaller plant serving 50,000 residents did interrupt cogeneration, shutting down a steam turbine and the water treatment system. [5] [6]

Meanwhile the estate is growing. Government projections cited in the March 2026 consultation put battery storage capacity on a six-fold increase and wind and solar capacity almost tripling by 2030. [5] Ofgem currently regulates just over 1,400 licensed operators, and Government has described the absence of cyber resilience requirements across a large proportion of them as one of two fundamental reform needs. [3]

What the Regulatory Position Actually Is

Schedule 2 of the NIS Regulations 2018 sets the thresholds at which an operator becomes an Operator of Essential Services. For downstream gas and electricity these are as follows.

Essential ServiceElectricityGas (Downstream)
Generation2GW or more (cumulative)N/A
TransmissionMore than 250,000 final customersMore than 250,000 final customers
Offshore Transmission2GW or more (cumulative)N/A
DistributionMore than 250,000 final customersMore than 250,000 final customers
Interconnectors1GW or moreMore than 20M m3 gas per day
SupplyMore than 250,000 final customersMore than 250,000 final customers
Load Control300MW or moreN/A

Source: DESNZ and Ofgem consultation documents, drawn from NIS Regulations 2018 Schedule 2. Generation excludes nuclear generators and generators not connected to a transmission system. Capacity is cumulated across affiliated undertakings. Load control is not yet in force and will be commenced through the Cyber Security and Resilience Bill. [2] [3]

Two features of that table deserve attention. First, generation capacity is cumulated across a corporate group, so a modest site inside a large portfolio can sit above the line while a standalone site of identical rating sits below it. Second, generators not connected to a transmission system are carved out regardless of size, which removes most distribution-connected embedded generation from scope entirely.

Government consulted on this between 27 March and 22 May 2026 and published its response on 5 August 2026. Nineteen respondents told Government that the electricity generation threshold should change. Twenty-one argued that thresholds should be driven by risk or impact rather than by supply or generation volume, and 19 said the sector has become distributed to the point where current thresholds no longer reflect where risk arises. Six respondents proposed specific replacement figures, including 200MW and 500MW for generation. [3]

Government has not adopted a new number. It has commissioned the National Energy System Operator to advise on which services and thresholds should apply, and intends to consult on any revisions during 2027, subject to the Cyber Security and Resilience Bill receiving Royal Assent. The response states that Royal Assent is expected in early 2027, though secondary coverage consistently reports an expectation of late 2026. The Bill completed Lords Second Reading on 14 July 2026 and entered Lords Committee Stage on 1 September 2026. [3] [8]

Alongside that review, Government confirmed it will introduce baseline cyber resilience requirements for all Ofgem licensees, delivered through licence conditions and founded on Cyber Essentials Plus. Ofgem will consult on the detail during 2027. The public commitment is that a baseline level of cyber resilience will be in place across the whole downstream gas and electricity system by the end of 2030. Any intermediate tier between baseline and NIS is expected to be considered only after 2030. [3]

Who is Affected by the Sub-Threshold Gap?

Sub-threshold generators and distributed energy operators. Operators of embedded gas plant, solar, onshore wind, battery storage and long duration storage that fall below 2GW, or that are not transmission-connected, carry no statutory cyber resilience obligation today and will carry none until baseline requirements are implemented through licence conditions. Many of these sites are unmanned and dependent on remote access.

NIS-designated operators. Designation does not insulate a large operator from the gap. NIS requirements apply only to the network and information systems on which the essential service relies, which Government acknowledges leaves ancillary, supporting and back-end systems outside scope. [5] Large operators also depend on smaller counterparties for flexibility, balancing and aggregation.

Aggregators, flexibility platforms and remote service providers. Consultation respondents identified flexibility services, aggregators and orchestration platforms as the most commonly proposed additions to the essential services list, alongside digital and data platforms and remote monitoring and management providers. [3] Some of these organisations will be captured as large load controllers at 300MW of aggregate controllable load. Many will not.

Boards and investors in generation assets. The regulatory floor is now dated and public. A board that waits for 2030 is accepting four years of exposure on an asset class that has already been taken offline once.

What Are the Challenges the 2030 Baseline Does Not Solve?

The most significant issue is that the announced remedy is shaped for information technology, not for the control systems that took the plant offline.

Government has been candid about this. The consultation observed that Cyber Essentials is primarily suitable for IT, that many downstream gas and electricity operators rely on SCADA systems, programmable logic controllers, human machine interfaces and remote telemetry units, and that applying Cyber Essentials controls to those environments can be challenging and in certain circumstances unsuitable. [5] The government response goes further, recognising that Cyber Essentials Plus has limitations for the energy sector in relation to the exclusion of operational technology and the absence of controls for governance, incident response, risk management and supply chain. [3]

Respondents said the same thing with numbers behind it. IT and OT integration or network segmentation was the leading requested addition at 18 respondents, followed by incident response and exercising at 17, remote access management at 13, supply chain visibility at 12 and governance at 10. When asked for alternative frameworks, respondents most often named the NCSC Cyber Assessment Framework at 16 and IEC 62443 at 15, ahead of ISO 27001 at 14. [3] The sector asked for an OT-aware standard. What has been confirmed so far is an IT scheme that Government intends to build on, with the additional controls still to be designed. It is worth being precise about what the Plus tier adds: Cyber Essentials Plus applies the same five technical controls as Cyber Essentials and subjects them to independent technical testing rather than extending them. [9] Choosing Plus over the base scheme raises the assurance level, not the scope.

Three further constraints compound this. Government intends that, where possible, baseline requirements should apply only to systems not already covered by existing cyber resilience obligations, which creates scope boundaries that operators will need to evidence rather than assume. [3] Consultation respondents reported that the prescriptiveness of Cyber Essentials controls and the inability to use compensating controls were common drivers of cost in OT-heavy and legacy environments. [3] And the assurance route for complex estates is still under exploration, with Government committing only to examine the potential of NCSC Cyber Essentials Pathways. [3]

The practical conclusion for a security leader is that compliance and resilience are not the same programme here, and neither of them arrives before 2030.

How IOActive Can Help

The gap this post describes is not a compliance problem yet, which is precisely why it is an assessment problem now. An operator below the 2GW line has no licence condition to evidence against and no NIS designation to scope, so the only reliable way to establish its position is to test the estate against a framework the eventual baseline will have to catch up to.

IOActive has operated in industrial control environments since building the first proof-of-concept worm against the smart grid in 2009 [10], and has helped define standards and best practices including NIST 800-53 and 800-37. The services below map to the specific gaps the 2030 baseline leaves open.

Full Stack Security Assessments

Government has confirmed that Cyber Essentials Plus excludes operational technology and that applying its controls to SCADA systems, programmable logic controllers, human machine interfaces and remote telemetry units can be unsuitable. Our Full Stack assessments examine the whole environment rather than a single layer, covering the controllers and HMIs at distribution-connected sites, the OT/IT boundary, and the cellular and vendor paths that commonly provide unmanned generation assets with connectivity nobody has inventoried. Where the baseline will eventually ask for evidence, an assessment produces it rather than assuming it.

Hardware and Firmware Security Research

The assets in question are largely unmanned and remotely operated, which places the security of the controller and telemetry unit itself in scope rather than only the network around it. Our hardware and firmware research examines the devices deployed at these sites directly, at a depth that network-layer testing cannot reach and that no IT-derived certification scheme currently asks for.

Supply Chain Integrity

Consultation respondents named supply chain visibility among the leading controls missing from Cyber Essentials Plus, and identified aggregators, flexibility platforms and remote monitoring providers as the additions most often proposed to the essential services list. Our Supply Chain Integrity work assesses the posture of technology providers and critical third parties, covering firmware, embedded systems, remote access arrangements and procurement, so that inherited risk is identified before it becomes a shared incident. For operators contracting with aggregators and remote service providers, this is the exposure that sits outside their own perimeter and inside their own outage.

Red Team and Purple Team Services

Incident response and exercising was the second most requested addition to the baseline, at 17 respondents. Adversary simulation is how an operator establishes whether an intrusion at a small asset would be detected and contained before it interrupts generation, rather than assuming the segmentation on the network diagram holds under test.

Advisory Services

The 2027 consultations will ask operators to state which systems fall inside a future baseline, which already sit inside NIS scope, and where residual OT exposure lies. That is a scoping determination an operator has to be able to defend, not describe. Our Advisory Services cover programmatic security review, security programme development and management, and Virtual CISO support, and the output is a documented scope position for each asset, a remediation sequence with named owners and dates, and the evidence pack a board or regulator will ask for.

If you would like to discuss where your generation or distributed energy assets sit against the thresholds described in this post, and what the residual OT exposure looks like, we welcome the conversation.

  1. Establish the regulatory position of every generating asset in the portfolio, including cumulative group capacity and whether the connection is to a transmission or a distribution system, and record the basis for each determination.
  2. Treat the 2030 baseline as a floor rather than a target, and assess the estate against an OT-aware framework such as IEC 62443 or the NCSC Cyber Assessment Framework rather than waiting for licence conditions to be drafted.
  3. Inventory remote access into unmanned sites, including vendor and maintenance pathways, and verify that segmentation between corporate IT and control networks holds under test rather than on the network diagram.
  4. Extend incident response plans to cover loss of generation at a sub-threshold asset, and exercise them, given that incident response and exercising was the second most requested control in the consultation.
  5. Review contractual cyber security obligations with aggregators, flexibility platforms and remote monitoring providers, several of which may be brought into NIS scope during the 2027 review.
  6. Engage with the Ofgem consultation expected during 2027, since the additional controls that sit above Cyber Essentials Plus are still being designed and sector evidence will shape them.

Conclusion

The regulatory perimeter for British electricity generation was drawn around a small number of very large assets in 2018, for an energy system that no longer exists. Government has recognised this, commissioned advice on where the line should move, and committed to a baseline for every Ofgem licensee by the end of 2030. That work is welcome and it is also four years away, and the scheme chosen as its foundation does not currently reach operational technology.

Operators that have already been targeted do not have four years, and press analysis published a month after the incident concluded that Britain’s small power plants face continued cyber risk. [7] The organisations that come through the next phase in good order will be those that treat the 2030 baseline as the minimum they will eventually be asked to evidence, and build OT security ahead of it on their own timetable.

References

  1. The Register, “Iran-linked cyberattack shut down a UK power plant”, 24 August 2026, carrying the Department for Energy Security and Net Zero statement on the small-scale energy generator incident. https://www.theregister.com/security/2026/08/24/iran-linked-cyberattack-shut-down-a-uk-power-plant/ First reported by The Sunday Telegraph, 22 August 2026 (paywalled).
  2. The Network and Information Systems Regulations 2018, Schedule 2, U.K. Essential Services and Threshold Requirements. https://www.legislation.gov.uk/uksi/2018/506/schedule/2 (revised text as in force at 2 September 2026).
  3. Department for Energy Security and Net Zero and Ofgem, “Reshaping cyber regulation in downstream gas and electricity: government response”, 5 August 2026. https://www.gov.uk/government/consultations/whole-energy-cyber-resilience-requirements-reshaping-cyber-regulation-in-downstream-gas-and-electricity
  4. Department for Energy Security and Net Zero, Ofgem, NCSC and NESO, “Energy Sector Cyber Security Strategy”, 28 May 2026. https://www.gov.uk/government/publications/energy-sector-cyber-security-strategy/energy-sector-cyber-security-strategy
  5. Department for Energy Security and Net Zero and Ofgem, “Reshaping cyber regulation in downstream gas and electricity: consultation document”, 27 March 2026. https://assets.publishing.service.gov.uk/media/69c51142471d520038d0f68d/whole-energy-resilience-consultation-document.pdf
  6. CERT Polska, “Energy Sector Incident Report – 29 December”, published January 2026. https://cert.pl/en/posts/2026/01/incident-report-energy-sector-2025/ (full report: https://cert.pl/uploads/docs/CERT_Polska_Energy_Sector_Incident_Report_2025.pdf). See also CERT Polska, “Follow-Up Report of the December 2025 Energy Sector Incident”, August 2026. https://cert.pl/en/posts/2026/08/incident-follow-up-report-energy-sector-2025/
  7. The Guardian, “UK’s small power plants face continued cyber risk after Iran-linked hack”, 27 August 2026. https://www.theguardian.com/business/2026/aug/27/uk-small-power-plants-risk-cyber-attacks-iran-hack
  8. Cyber Security and Resilience (Network and Information Systems) Bill, HL Bill 32, introduced to Parliament 12 November 2025. Lords Second Reading 14 July 2026, Lords Committee Stage from 1 September 2026. https://bills.parliament.uk/bills/4035
  9. National Cyber Security Centre, Cyber Essentials. https://www.ncsc.gov.uk/cyberessentials/overview
  10. M. Davis, IOActive, “Advanced Metering Infrastructure (Smart Grid) Device Security”, Black Hat USA 2009. https://blackhat.com/presentations/bh-usa-09/MDAVIS/BHUSA09-Davis-AMI-SLIDES.pdf
INSIGHTS | August 10, 2026

When the Advisory Arrives First: Minnesota’s Water Utilities and the Limits of Warning

Key Takeaways

  • More than 30 Minnesota community water systems were targeted across July 26 and 27, 2026 in what Minnesota IT Services (MNIT) has characterized as a coordinated cyberattack. Automated control functions were affected at several utilities, and the City of Braham briefly took its water treatment plant offline [4][6][9].
  • No attribution has been made. Officials have not named a threat actor, identified an exploited vulnerability, confirmed which products were affected, or established whether data was taken [4][7].
  • The incidents followed four days after the July 22 update to joint advisory AA26-097A, which widened observed Iranian-affiliated targeting of internet-facing programmable logic controllers (PLCs) from Rockwell Automation equipment to include Schneider Electric and Siemens devices [1][3].
  • The City of Plymouth reported that impact was confined to equipment reached over cellular links. Remote assets — water towers, lift stations, pump stations — frequently sit outside the boundary of formal risk and vulnerability assessments [4][10].
  • The consequence class here is loss or manipulation of view and control, not data loss. Operators in the UK and Europe carry equivalent exposure, under a regulatory regime that is tightening as the UK Cyber Security and Resilience Bill progresses through Parliament [16].

Why This Incident Matters Now

A joint advisory told critical infrastructure operators, in specific terms, that state-linked actors were reaching internet-facing PLCs at water and wastewater utilities and manipulating what those controllers do. Four days later, more than 30 water systems in a single US state reported disrupted automated controls over a 48-hour period.

Whether the two events are connected has not been established publicly, and this analysis does not assume they are. The more useful question for security leaders is what the sequence reveals about the distance between a warning being issued and a warning being actioned. Advisory AA26-097A has been in circulation since April 7, 2026 [1]. Its July update did not describe a novel technique. It broadened the list of affected manufacturers and added detection guidance. For any operator running an internet-reachable controller from one of the named vendors, the required response was already documented, already free, and already several months old.

The Minnesota incidents are therefore worth examining less as a novel threat and more as a measurement of how much of the sector is positioned to act on advisories at the speed at which they are now being issued.

What Actually Happened in Minnesota

MNIT confirmed that more than 30 community water systems were targeted on July 26 and 27, 2026, and activated a statewide cybersecurity incident response [4][6][8]. The agency is coordinating with CISA, the Environmental Protection Agency (EPA), the FBI, state agencies and affected utilities [5][6]. The FBI has confirmed it is in contact with victims [6].

Four cities disclosed incidents publicly: Braham, Maple Plain, Plymouth and South St. Paul [4][9][10][11][12]. The reported pattern is consistent across them. Automated control functions were affected; contingency procedures were activated; in most cases water and wastewater operations continued. Braham took its treatment plant offline after detecting the incident and asked residents to limit water use, later reporting that the attackers had shut down operating controls, taking the well and treatment plant with them [4][9]. Maple Plain declared a local state of emergency to support its response [5][12]. South St. Paul reported that manual intervention by public works staff maintained normal operations despite the loss of some automated controls [4][11]. Plymouth attributed communications problems at two water towers and multiple lift stations to the incident, and stated that the impact was limited to equipment connected via cellular communications [4][10].

The affected cities have consistently informed residents that drinking water remains safe. MNIT stated on July 28 that it was aware of no active requests for residents to alter their water use [5].

Several material facts remain unpublished. MNIT has not released a full list of affected systems. No exploited vulnerability, affected product line or exfiltration finding has been made public. No actor has been named. Iranian-affiliated groups such as CyberAv3ngers and Handala fit the profile of the activity, and several outlets have noted the resemblance, but investigators have stressed that formal attribution has not been made [4][7]. Analysts should treat the attribution question as open.

What Changed in Advisory AA26-097A on July 22

Advisory AA26-097A was first published on April 7, 2026 by the FBI, CISA, the NSA, the EPA, the Department of Energy and US Cyber Command’s Cyber National Mission Force. It documented Iranian-affiliated advanced persistent threat (APT) actors exploiting internet-connected operational technology (OT) devices across the Government Services and Facilities, Water and Wastewater Systems, and Energy sectors, with confirmed disruption at victim organizations since at least March 2026 [1][2].

The July 22 update made three substantive changes [1][2][3].

Manufacturer Scope Widened

Observed targeting now extends beyond Rockwell Automation and Allen-Bradley controllers to Schneider Electric and Siemens PLCs, and potentially other branded devices. Specific models are named in the advisory, including Rockwell CompactLogix and Micro850, Schneider Modicon M340, and the Siemens S7-1200 series [3].

Detection Guidance for Reusable Code Modules

The update adds guidance on identifying malicious modifications to reusable logic — Add-On Instructions within Rockwell programs, for example — including validating project files and comparing running logic against a known-good baseline [3].

A Refreshed Indicator Set and a New Co-Authoring Agency

The update publishes a refreshed set of indicators of compromise, and the Department of the Treasury is added as a co-authoring agency [1][17].

The access method described in the advisory is the part that should concern operators most, because it is not a vulnerability in the conventional sense. Actors reach internet-exposed controllers from leased overseas hosting infrastructure and connect using the manufacturers’ own engineering software — Studio 5000 Logix Designer, EcoStruxure Control Expert, TIA Portal — the same tooling legitimate engineers use [1][3]. Connections made this way are difficult to separate from authorized administrative activity. From there, the advisory documents modification of control logic, disabling of alarm and shutdown functions, and alteration of data presented on operator displays [3].

Water and Wastewater Systems is named explicitly among the targeted sectors, and internet-exposed PLCs remain the primary access point [3].

Who Is Affected by Internet-Exposed OT?

US Water and Wastewater Operators

The sector’s risk profile varies enormously by resource level. Large municipal utilities often run segmented networks, dedicated security staff and formal asset lifecycle management. Most community water systems are small municipal utilities or rural cooperatives, some serving only a few hundred customers, without dedicated cybersecurity personnel or continuous monitoring [14]. A technique that a well-resourced utility would contain quickly can cause prolonged operational impact in a small system. The EPA leads federal water sector cybersecurity efforts but has no explicit statutory authority to mandate cybersecurity measures, relying on voluntary engagement and technical assistance [15].

UK and European Operators

Drinking water is an in-scope sector under the UK’s NIS Regulations 2018, and the UK Cyber Security and Resilience (Network and Information Systems) Bill would expand obligations, incident reporting requirements and regulatory powers across those sectors [16]. The Bill received its second reading in the House of Lords on July 14, 2026 [16]. The technical exposure is not materially different: the same vendors, the same engineering tooling, and the same practice of reaching remote assets over public networks.

Critical National Infrastructure (CNI) Operators in Other Sectors

Energy and government facilities are named alongside water in AA26-097A. Any organization running the named controller families in an internet-reachable configuration is within the described targeting scope, regardless of sector [1][3].

System Integrators and OT Suppliers

Where control system architecture is delivered by an integrator, the connectivity decisions — including secondary and backup communication paths — are frequently made outside the asset owner’s direct visibility. Under the Cyber Security and Resilience Bill, suppliers to regulated entities face obligations of their own [16].

What Are the Practical Challenges for Operators?

Remote Assets Are the Architecture’s Blind Spot

Plymouth’s disclosure that impact was limited to cellular-connected equipment is the most operationally instructive detail released so far. Water towers, lift stations and pump stations commonly report back to supervisory control and data acquisition (SCADA) systems over cellular modems, and these secondary or alternative communication links are routinely omitted from risk and vulnerability assessments [4]. This is not a new failure mode. In the 2020 attacks on Israeli water facilities, actors linked to the Iranian government used vulnerable cellular routers as the point of entry [4]. An assessment scoped to the plant boundary will not find a modem on a tower six miles away.

The Relevant Consequence Is Not Data Loss

In MITRE ATT&CK for industrial control systems (ICS) terms, the consequences at stake are denial or loss of view, denial or loss of control, and manipulation of view or control [4]. A physical process can continue running while operators lose the ability to see or influence it. Manipulation is the more dangerous case, because the process may be in a state that differs from what the screens report — precisely the scenario AA26-097A describes when it documents altered operator display data [1][3]. Detection strategies built around data exfiltration will not register any of this.

Advisory Volume Exceeds Absorption Capacity

Four days is a short interval between an advisory update and a sector-wide incident, but the underlying advisory was nearly four months old. The constraint is not awareness. It is the engineering time to inventory controllers, establish logic baselines, remove internet exposure and rehearse manual operation — work that competes with statutory obligations for water quality, capital works and day-to-day service delivery.

Attribution Absorbs Attention That Belongs Elsewhere

Whether the Minnesota incidents prove to be Iranian-affiliated changes very little about the required response. The controls that reduce exposure to this activity are the same controls regardless of who is behind it, and waiting for attribution before acting concedes time to the adversary.

How IOActive Can Help

IOActive’s work in critical infrastructure spans the technical and strategic worlds of OT and ICS security, from the semiconductor inside a controller to the governance program around it. Our team has operated in ICS environments since building the first proof-of-concept worm against the smart grid in 2009 [20], and has helped define standards and best practices including NIST 800-53 and 800-37. The two gaps this incident exposes are assessment problems before they are tooling problems: assessment scope that stops at the plant boundary and misses remote, cellular-connected assets, and the absence of an authoritative baseline against which controller logic can be validated. The services below address each directly.

Full Stack Security Assessments

Most providers scan at the network or application layer only. Our Full Stack Security Assessments examine the entire environment, drilling down to the facility and silicon level and up through the personnel, process, and supply-chain layers around it. For a water or wastewater operator, that means scoping to the whole estate rather than the plant boundary — the towers, lift stations and pump stations that report back over cellular modems, the OT/IT boundary, and the third-party managed links that are frequently the only route in. Drawing on our hardware research background, it also extends to the firmware and silicon of PLC and human-machine interface (HMI) devices themselves through penetration testing, reverse engineering, side-channel analysis, and fault injection. It is the same class of work behind our research Compromising Industrial Facilities from 40 Miles Away, which showed how a memory-corruption flaw in widely deployed industrial wireless automation devices could be exploited remotely to disable field sensor nodes — exactly the kind of remotely reachable field connectivity that Plymouth’s disclosure points to [18].

Red Team and Purple Team Services

Manipulation of view and control is the consequence class that matters here, and it is precisely what adversarial testing exists to surface. Our Red Team engagements emulate the tradecraft AA26-097A describes, including the “living off the land” use of vendors’ own engineering software in place of exploits, while our Purple Team work translates those findings into measurable improvements in whether your operators and analysts would actually detect unauthorized logic changes in time to act. It is the tabletop in step 6 below, run against the live environment rather than a whiteboard. IOActive research has repeatedly shown how attackers can blind the humans in the loop: our study SCADA and Mobile Security in the IoT Era found that more than 20% of the vulnerabilities identified across dozens of ICS mobile applications could let an attacker misinform operators or influence the industrial process directly [19].

Supply Chain Integrity

Where control system architecture is delivered by an integrator, connectivity decisions — including secondary and backup communication paths — are frequently made outside the asset owner’s visibility, and AA26-097A documents the vendors’ own configuration software being used as the access channel. Our Supply Chain Integrity service assesses the security posture of technology providers and critical third parties, reviewing firmware, embedded systems, remote-access arrangements, and procurement processes for inherited risk before it becomes an incident vector. Under the UK Cyber Security and Resilience Bill, suppliers to regulated entities will carry obligations of their own [16].

Secure Development Lifecycle

The advisory urges device manufacturers to adopt secure-by-default design rather than leaving operators to compensate for exposed controllers [1]. For the vendors and OEMs in the PLC, remote terminal unit (RTU) and HMI supply chain, our Secure Development Lifecycle work embeds security review into design and engineering — from threat modeling through code review and pre-release testing — so that the next generation of devices does not ship with the internet-reachable defaults this campaign depends on.

Advisory Services

Removing internet exposure is an architectural program, not a one-time patch, and there is no CVE here to wait for. Our Advisory Services — spanning programmatic security review, security program development and management, and Virtual CISO support — help water sector leaders and boards turn an advisory into a prioritized remediation plan, close the gap between a warning being issued and a warning being actioned, and prepare for the reporting obligations that arrive with an incident: Cyber Incident Reporting for Critical Infrastructure Act (CIRCIA) timelines in the US, and current and forthcoming NIS duties in the UK [15][16].

  1. Establish whether any controller is reachable from the internet. This means verification against the live estate, not a review of the network diagram. Include devices reached over cellular, satellite, radio and any third-party managed link, in line with the joint NCSC-UK, CISA and FBI secure connectivity principles for OT [13].
  2. Extend assessment scope to every remote asset. Towers, lift stations, pump stations and any site with an independent communications path. Where an integrator built the connectivity, request the full inventory of links in writing.
  3. Capture an offline logic and configuration baseline for every controller. This is both a detection capability and a recovery capability. Without it, comparing running logic to known-good logic — the core of the advisory’s new detection guidance — is not possible.
  4. Apply the AA26-097A mitigations directly. Remove direct internet exposure, change default credentials on PLCs and HMIs, enforce multi-factor authentication on all remote OT access, and enable controller key switches or run/program mode protections where the platform supports them [1][3].
  5. Ingest the refreshed indicators and hunt for engineering software activity. Look specifically for vendor engineering tooling running on hosts that are not designated engineering workstations, and for connections to controllers from unexpected sources [1].
  6. Rehearse the manipulation scenario, not the outage scenario. Run a tabletop in which operator displays report normal conditions while the process deviates. The exercise should establish how staff would detect the discrepancy, what independent instrumentation exists, and how manual operation would be initiated and sustained.
  7. Verify that incident reporting obligations are understood before they are triggered. For US utilities, CIRCIA reporting timelines; for UK operators, current and forthcoming NIS obligations under the UK Cyber Security and Resilience Bill [15][16].

Conclusion

The Minnesota utilities appear to have avoided serious consequences largely because staff reverted to manual operation and contingency plans held. That is a real result, and it reflects institutional competence that deserves acknowledgment. It is also a thin margin, and it depended on operators noticing that something was wrong.

The uncomfortable element of this incident is not that it happened without warning. It is that the warning was issued, updated, distributed through federal channels and sector information sharing and analysis centers (ISACs), and reported in the trade press — and the interval between that warning and disrupted controls in more than 30 communities was four days. Advisories are only a control if the organization receiving them has the capacity to act. For much of the water sector, on both sides of the Atlantic, that capacity is the constraint that needs addressing, and it will not be resolved by another advisory.

If you would like to discuss how your organization’s controller exposure and remote-asset connectivity measure up against the activity described here, or how IOActive can support your OT/ICS resilience program, we welcome the conversation.

References

[1] CISA, FBI, NSA, EPA, DOE, CNMF and US Department of the Treasury. Iranian-Affiliated Cyber Actors Exploit Programmable Logic Controllers Across US Critical Infrastructure (AA26-097A), published April 7, 2026, updated July 22, 2026. https://www.cisa.gov/news-events/cybersecurity-advisories/aa26-097a

[2] Internet Crime Complaint Center (IC3). Advisory AA26-097A (PDF), July 22, 2026. https://www.ic3.gov/CSA/2026/260722.pdf

[3] WaterISAC. (TLP:CLEAR) CISA Updates Iranian-Affiliated PLC Targeting Advisory (AA26-097A), July 2026. https://www.waterisac.org/tlpclear-cisa-updates-iranian-affiliated-plc-targeting-advisory-aa26-097a

[4] E. Kovacs. Dozens of Minnesota Water Utilities Targeted in Coordinated OT Attacks, SecurityWeek, July 29, 2026. https://www.securityweek.com/dozens-of-minnesota-water-utilities-targeted-in-coordinated-ot-attacks/

[5] Coordinated Cyberattack Targets 30+ Minnesota Water Systems as One Plant Goes Offline, The Hacker News, July 2026. https://thehackernews.com/2026/07/coordinated-cyberattack-targets-30.html

[6] Authorities investigating a coordinated cyberattack against Minnesota water systems, Cybersecurity Dive, July 28, 2026. https://www.cybersecuritydive.com/news/authorities-investigating-a-coordinated-cyberattack-against-minnesota-water/826427/

[7] Coordinated cyberattack disrupts water utilities in 30+ Minnesota communities, StateScoop, July 28, 2026. https://statescoop.com/coordinated-cyberattack-disrupts-water-utilities-in-30-minnesota-communities/

[8] Hackers target over 30 Minnesota water utilities in coordinated OT attack, BleepingComputer, July 29, 2026. https://www.bleepingcomputer.com/news/security/hackers-target-over-30-minnesota-water-utilities-in-coordinated-ot-attack/

[9] City of Braham. Cyber security incident statements, July 2026. https://brahammn.gov/

[10] City of Plymouth. News release, July 2026. https://www.plymouthmn.gov/Home/Components/News/News/8977/542

[11] City of South St. Paul. News release, July 2026. https://www.southstpaulmn.gov/m/newsflash/Home/Detail/900

[12] City of Maple Plain. Press Release: Cyber Security Incident, July 2026. https://www.mapleplainmn.gov/administration/page/press-release-cyber-security-incident

[13] NCSC-UK, CISA, FBI and international partners. Secure Connectivity Principles for Operational Technology, January 2026. https://www.cisa.gov/news-events/news/cisa-uk-ncsc-fbi-unveil-principles-combat-cyber-risks-ot

[14] Testimony before the US Senate Committee on Environment and Public Works. The Cybersecurity State of the Water Sector, February 4, 2026. https://www.epw.senate.gov/public/_cache/files/5/3/53d93dfe-ed8c-4e48-b705-0b16cb92c90a/FA38A32EE48D7F3D4B0C069FDC08A69E6327376EB85838A03310B2E91C8582C1.02-04-2026-dr.-simonton-testimony.pdf

[15] Nossaman LLP. Water Utilities: Congress Temporarily Extends Cyber Laws, EPA Releases New Guidance, November 2025. https://www.nossaman.com/newsroom-insights-water-utilities-congress-temporarily-extends-cyber-laws-epa-releases-new-guidance

[16] House of Lords Library. Cyber Security and Resilience (Network and Information Systems) Bill: HL Bill 32 of 2026–27, June 2026. https://lordslibrary.parliament.uk/research-briefings/lln-2026-0032/

[17] ComplianceHub. CISA Updates AA26-097A: Iranian-Affiliated PLC Targeting Widens to Schneider and Siemens, July 2026. https://compliancehub.wiki/cisa-aa26-097a-update-iranian-plc-targeting-critical-infrastructure-july-2026/

[18] IOActive. Compromising Industrial Facilities from 40 Miles Away (white paper). https://www.ioactive.com/wp-content/uploads/2018/05/IOActive_Compromising_Industrial_Facilities_from_40_Miles_Away.pdf

[19] IOActive (A. Bolshev, I. Yushkevich). SCADA and Mobile Security in the IoT Era. https://www.ioactive.com/scada-and-mobile-security-in-iot-era/

[20] M. Davis, IOActive. Advanced Metering Infrastructure (Smart Grid) Device Security, Black Hat USA 2009. https://blackhat.com/presentations/bh-usa-09/MDAVIS/BHUSA09-Davis-AMI-SLIDES.pdf